Building Technology 1

Assignment 1 – Industrialised Building System

Introduction
This is a group assignment which predominantly relates to the topics of Industrialised Building System (IBS) as well as the materials’ embodied energy. Before embarking on this project students will be exposed with different types and methods of the IBS system and the calculation of embodied energy of different building materials in the classroom. First, the group has to design a 3-storey apartment block using mainly IBS components. Then, the group has to construct a physical model of the building to imitate the actual IBS construction process and to record all the process in a video.

​

Objectives of Project
1. To develop students’ understanding in different types of IBS construction method.
2. To apply appropriate IBS construction method in the production of a model for an apartment building.
3. To demonstrate a comprehensive understanding of IBS construction process through model making.
4. To develop students’ understanding in matters related to energy efficiency and ecological impact.
5. To foster good communication skills among group members through proper delegation of works and production of the video.


Learning Outcomes of this Project
1. Identify and collect relevant research data.
2. Explain a set of architectural and structural documentation.
3. Relate basic structural elements and structural principles in construction.
4. Analyse and document construction methods and materials.
7. Critique issues pertaining to energy efficiency, embodied energy as well as ecological impact.


Tasks - Methodology
1) Form a group of 5 or 6 students.
2) Perform a study on a building preferably an apartment, which was constructed fully or partially using IBS method and identify all the IBS components used including appropriate sizes, etc.
3) Design one or two types of apartment units which size should not exceed 100 square meters and consists of a living hall, a dining area, three bedrooms and two toilets. The design should incorporate mainly IBS components such as precast wall, hollow core slab, precast staircase, toilet pod, prefabricated timber roof truss, etc. with appropriate sizes.
4) The units should be arranged as follows and made into three levels. However, for the model one side of the building can be cut into half to show the cross section.
5) Construct the IBS components of the model individually then joint all of them together in the actual way that an IBS building is constructed. All the process including fabrication of components and sequence of construction in the production of the model should be included in the video. A number of blow-up connection details of different parts of the model should also be produced.
6) Also provide in the video some descriptions about the building and construction system concerning energy efficiency and ecological impact as well as the embodied energy calculations.

Assignment 2 – Construction Solutions

Introduction
This assignment is aligned with the Studio Design Project (semester 4 and 5) and aims to facilitate students in the technical studies and development of their design. It deals with the analysis and establishment of the structural and the envelope systems of the student’s design to ensure that the design has logical and workable construction systems. It also encourages students to think about construction as integral part of the design and not just an afterthought. Most of the times amateur designers tend to design their spaces without thinking about the construction aspects and later on have to change and redesign their schemes due to the designs were unbuildable. This assignment was design with the intention to tackle this issue and to increase the technical competency of students

​

Objectives of Project
1. To encourage analytical and critical study of the principles, practices and details of building technology in the
student’s own design.
2. To encourage students to consider the construction aspects throughout the design process.
3. To adapt and implement the alternative construction systems into the students’ design.


Learning Outcomes of this Project
4. Analyse and document construction methods and materials
5. Evaluate existing construction system and detailing of the selected project.
6. Critique issues pertaining to construction principles, materials, techniques, codes of practice, process of
assembly, and detailing.
8. Generate alternative construction solutions by means of sketches and drawings.