BUILDING SERVICE

PROJECT 1. APPLICATION OF BUILDING SERVICES (40%)

​

 

Objectives of Project The objective of this project is as follows:

1. To develop students understanding and knowledge of building services systems in design and construction.

2. To apply appropriate building services system and solution for a specific design.

3. To demonstrate a comprehensive understanding of applicability of specific building services systems in the design in response to practical considerations.

4. To develop students’ ability to resolve issues related to specific building services systems.

 

Learning Outcomes of this Project On completion of this assignment, students will be able to:

1. Identify relevant information related to water supply, liquid waste disposal, mechanical air-conditioning, fire safety and vertical transportation system.

2. Describe the planning of building services within the total design and construction process.

3. Describe the installation of building services within the total design and construction process.

 

2 Tasks - Methodology This project is related to the students’ studio design project in semester 2 which relates to a domestic size building (i.e. a retreat house, etc.) Students are expected to demonstrate their understanding of building services by proposing and designing the most appropriate systems for the building which include:

i) electrical supply system

ii) cold water and hot water supply system

iii) sewerage and sanitary system

iv) drainage system

Therefore students are required to produce appropriate drawings and diagrams which include specifications, symbols, legends, images, texts, etc. to describe the planning and installation of all the building services. Additionally, students may also include specific clauses from the Uniform Building By-Law (UBBL) or other relevant Acts, Laws or guidelines which relate to the proposed systems into their presentation boards.

PROJECT 1. APPLICATION OF BUILDING SERVICES (40%)

Project 2 - Case Study and Documentation of Building Services Systems
30% of the total assessment (20% group work & 10% individual)

 

Objectives of Project
The objectives of this assignment are as follows:
1. To introduce students to the basic principles, process and equipment of various building services systems through real life project (experiential learning).
2. To expose students to the integration of various building services systems in a building.
3. To allow students to demonstrate their understanding of building services systems
4. To develop students’ understanding and familiarity on the drawing conventions and standards for different building services systems


Learning Outcomes of this Project
On completion of this assignment, students will be able to:
1. Identify and understand relevant information related to water and electrical supply, sewerage, mechanical ventilation and air-conditioning as well as fire protection systems.
2. Understand how each building services functions including the connections and position of different parts equipment.
3. Understand and explain the principles and systems as well as space implications and regulations related to different building services.

 

Tasks - Methodology
Form a group of between 5 to 6 students in the same tutorial group.
Under the tutelage of a lecturer, each group is required to choose a building of at least 4-storey high which can be either public or commercial buildings (i.e. office blocks, institutional buildings, shopping malls, etc.). Each group is to perform a thorough study and analysis of the following services systems associated to the building; i) mechanical ventilation and air-conditioning system, ii) electrical supply system, iii), mechanical transportation system as well as iv) fire protection system and document their findings accordingly. The purpose of this assignment is to give a clearer picture of what the students will and have learnt in the classroom and to evaluate their understanding on the systems that they have observed.
The requirements of the project are as follows.
ï‚§ Identify all the required building services components installed in the building.
ï‚§ Perform a thorough study on all the services systems;
i) mechanical ventilation and air conditioning system,
ii) electrical supply system,
iii) mechanical transportation system, and
iv) fire protection system
ï‚§ Obtain estimate dimensions and sizes of the spaces required for all the equipment and plant rooms identified.
ï‚§ Provide brief explanation on how the building services components function. This explanation shall be in qualitative form and therefore no calculation is required.
ï‚§ Summarize the systems in diagrammatic form.